Reducing Risk

Reducing risk of project cancellation

Not only can software development projects take longer than projected, 31% are cancelled before a usable product is produced [122]. Consider the following example:

. . . risk of litigation

US courts require that manufacturers "design for reasonable use and misuse" so the risk of litigation must be managed, especially since legal costs can easily escalate into the millions of dollars. The use of a formal, professional UXE process mitigates legal risk in two ways: (1) it increases product safety and therefore reduces legitimate claims; (2) it creates a strong, defensible legal position that acts as a deterrent to fallacious litigation [77]. Consider the unfortunate legal consequences of not using UXE methods:

Now that we have considered why to use UXE methods, we will consider when to use it.

 